Environmental Studies
- Waste Reduction Report (WRR) as per Tadweer, CWM
- Waste Reduction Action Plan (WRAP) as per Tadweer, CWM
- Environmental Permit Application (EPA)
- Environmental Impacts Assessment (EIA)
- Preliminary Environmental Review (PER)
- Construction Environmental Management Plan (CEMP) as per EAD Guideline
- CEMP Audit
- Strategic Environmental Assessment (SEA)
- Operational Environmental Management Plan (OEMP)
- Construction and Demolition Waste Management Plan (CDWMP)
- Environmental Action Plan (EAP)
- Baseline Surveys (including Air quality, water, soil, terrestrial ecology, marine ecology, noise etc.)
- Modeling Studies (Air emissions, noise etc.)
Environmental Studies
- Waste Reduction Report (WRR) as per Tadweer, CWM
- Waste Reduction Action Plan (WRAP) as per Tadweer, CWM
- Environmental Permit Application (EPA)
- Environmental Impacts Assessment (EIA)
- Preliminary Environmental Review (PER)
- Construction Environmental Management Plan (CEMP) as per EAD Guideline
- CEMP Audit
- Strategic Environmental Assessment (SEA)
- Operational Environmental Management Plan (OEMP)
- Construction and Demolition Waste Management Plan (CDWMP)
- Environmental Action Plan (EAP)
- Baseline Surveys (including Air quality, water, soil, terrestrial ecology, marine ecology, noise etc.)
- Modeling Studies (Air emissions, noise etc.)
Services
Contacts
Visit Us Daily
Hamdan Bin Mohammad Street,27 Abu Dhabi, United Arab Emirates
Have Any Questions?
+971 55 241 9873
Mail Us
info@geoenvsc.com