Environmental Studies

  • Waste Reduction Report (WRR) as per Tadweer, CWM 
  • Waste Reduction Action Plan (WRAP) as per Tadweer, CWM 
  • Environmental Permit Application (EPA)
  • Environmental Impacts Assessment (EIA)
  • Preliminary Environmental Review (PER)
  • Construction Environmental Management Plan (CEMP) as per EAD Guideline
  • CEMP Audit
  • Strategic Environmental Assessment (SEA)
  • Operational Environmental Management Plan (OEMP)
  • Construction and Demolition Waste Management Plan (CDWMP)
  • Environmental Action Plan (EAP)
  • Baseline Surveys (including Air quality, water, soil, terrestrial ecology, marine ecology, noise etc.)
  • Modeling Studies (Air emissions, noise etc.)

Environmental Studies

  • Waste Reduction Report (WRR) as per Tadweer, CWM 
  • Waste Reduction Action Plan (WRAP) as per Tadweer, CWM 
  • Environmental Permit Application (EPA)
  • Environmental Impacts Assessment (EIA)
  • Preliminary Environmental Review (PER)
  • Construction Environmental Management Plan (CEMP) as per EAD Guideline
  • CEMP Audit
  • Strategic Environmental Assessment (SEA)
  • Operational Environmental Management Plan (OEMP)
  • Construction and Demolition Waste Management Plan (CDWMP)
  • Environmental Action Plan (EAP)
  • Baseline Surveys (including Air quality, water, soil, terrestrial ecology, marine ecology, noise etc.)
  • Modeling Studies (Air emissions, noise etc.)