Occupational Health & Safety Studies

  • Development of Occupational Safety & Health Management system (OSHMS) V.4.0
  • Update of existing Occupational Health and safety Management System as per the latest requirement of ADOSH / OSHAD SF V.4.0
  • External 3rd Party Annual Compliance audit through Approved ADOSH / OSHAD Auditor as per ADOSH / OSHAD Requirements.
  • Internal Audit services
  • Assistance for the Implementation of OSHMS V.4.0 as per ADOSH / OSHAD requirements.
  • Assistance for the submission of Quarterly performance Report (Form E)
  • Assistance for the submission of Annual Cost report (Form E4)
  • Submission of annual Audit Report (Form F)
  • Occupational Safety & Health Construction Management Plan (OSH CMP) as per ADOSH / OSHAD SF CoP 53.1 or HSE Plan
  • Occupational Safety & Health (OSH) Demolition plan
  • Health, Safety and Environmental Impact Assessment (HSEIA)
  • Health, Safety and Environmental Management System (HSEMS)
  • Health, Safety and Environmental Critical Equipment Systems (HSECES)
  • Hazard Operability Studies (HAZOP)
  • Hazard Identification (HAZID)
  • Environmental Identification (ENVID)
  • Occupational Hazards Identification (OHID)
  • Project HSE Review (PHSER)
  • Noise and Vibration Studies
  • Human Factors Engineering (HFE) / Ergonomics Studies
  • ISO 45001 Occupational Health Safety Management system
  • Provision of full time HSE Expert at the project

Occupational Health & Safety Studies

  • Development of Occupational Safety & Health Management system (OSHMS) V.3.1
  • Update of existing Occupational Health and safety Management System as per the latest requirement of ADPHC / OSHAD SF V.3.1
  • External 3rd Party Annual Compliance audit through Approved OSHAD Auditor as per OSHAD / ADPHC Requirements.
  • Internal Audit services
  • Assistance for the Implementation of OSHMS V.3.1 as per OSHAD / ADPHC requirements.
  • Assistance for the submission of Quarterly performance Report (Form E)
  • Assistance for the submission of Annual Cost report (Form E4)
  • Submission of annual Audit Report (Form F)
  • Occupational Safety & Health Construction Management Plan (OSH CMP) as per OSHAD SF CoP 53.1 or HSE Plan
  • Occupational Safety & Health (OSH) Demolition plan
  • Health, Safety and Environmental Impact Assessment (HSEIA)
  • Health, Safety and Environmental Management System (HSEMS)
  • Health, Safety and Environmental Critical Equipment Systems (HSECES)
  • Hazard Operability Studies (HAZOP)
  • Hazard Identification (HAZID)
  • Environmental Identification (ENVID)
  • Occupational Hazards Identification (OHID)
  • Project HSE Review (PHSER)
  • Noise and Vibration Studies
  • Human Factors Engineering (HFE) / Ergonomics Studies
  • ISO 45001 Occupational Health Safety Management system
  • Provision of full time HSE Expert at the project